Shebandowan West Project

Shebandowan West ProjectOn December 10, 2007, the Company earned a 50% interest in the former producing Shebandowan mine and the surrounding Haines and Conacher properties pursuant to an option and joint venture agreement with Vale Inco. The properties, known as the Shebandowan property, contain a series of nickel copper-PGM mineralized bodies and the land package totals approximately 7,842 hectares. These properties are located 90 kilometres west of Thunder Bay, Ontario, and approximately 100 kilometres southwest from the Company’s Lac des Iles mine. Vale Inco retains an option to increase its interest from 50% to 60%, exercisable in the event that a feasibility study on the properties results in a mineral reserve and mineral resource estimate of the equivalent of 200 million pounds of nickel and other metals. As currently envisaged, the Shebandowan West Project will not trigger Vale Inco’s back-in right.

The Shebandowan West Project covers a small portion of the Shebandowan property and encompasses three shallow mineralized zones known as the West, Road and “D” zones, all of which are located at shallow depths immediately to the west of the former Shebandowan mine in an area known as the Shebandowan West Project. The Shebandowan West Project’s nickel‑copper-PGM mineralization is considered by management to represent the western extension of the Shebandowan mine ore body. The former Shebandowan mine, which was in operation from 1972 to 1998, produced 8.7 million tons of ore at grades of 2.07% nickel, 1.00% copper and approximately 3.0 grams per tonne PGM plus gold. A 43-101 Technical Report disclosing the results of a mineral resource estimate by an independent Qualified Person was filed on October 26, 2007.

In December 2007, the Company retained SRK Consulting to prepare a preliminary economic assessment of a mine development scenario that would entail excavation of the Shebandowan West Project by means of ramp-accessed underground mining methods at a rate of 500 to 1,000 tonnes per day, crushing the material on site and transporting it by truck to the Lac des Iles property for processing at the mine’s original mill. The original mill at Lac des Iles has been idle since 2001 and the Company believes that it could be refurbished quickly and at a relatively low cost if the project were to proceed. Preliminary metallurgical testing supports the possibility of producing a bulk sulphide concentrate from the Shebandowan West Project at the original mill.

The Company received a preliminary economic assessment on the project from SRK. However, in light of the sharp decline in metal prices in the fall of 2008, the Company ceased all activities with the Shebandowan Joint Venture, including at the Shebandowan West Project. A decision on when and whether to resume activities will largely depend on the long term outlook for nickel prices.

 

 

 

 
 

© North American Palladium - 2010. All rights reserved